Eagle Bank & Trust

 

Budget: 1.8 Million

Project Information:

Simms Building Group worked strenuously with a great team of subcontractors to deliver this project to the owner on time despite significant weather delays. One unique feature of this particular banking facility is the introduction of the virtual teller stations. The virtual teller stations are similar to that of the drive up but are located on the inside of the bank. Transactions between the customer and bank teller are made through the use of video screens at each station.

Center Oil Ethanol Plant 

 

Budget: $825,000

Project Information:

Simms Building Group were responsible for four buildings: Administrative Building, Receiving Building, Laboratory Testing Building and Maintenance Facility building interior renovation.

 

Boeing Restroom Renovation

 

Budget: $ 210,000

Project Information:

Renovation of three restrooms located on Boeings Campus. Simms role for the project was complete demolition of the restrooms and installation of new tile walls and flooring  along with new bathroom fixtures such a urinals, toilets and solid surface countertops. Also include in this project was a new light cove lighting system over the restroom stalls.

Image.

Commercial

Industrial

Simms is also devoted to community outreach through relationships with local schools and career opportunities.
Headquarters

1831 Chestnut Street Suite 100 

St. Louis, Missouri 63103 United States

TEL. (314) 292-6800

FAX (314) 292-6810

© Simms Building Group Copyright 2011 all rights reserved

  • Facebook Clean
  • Flickr Clean
  • LinkedIn - White Circle
bottom of page